EPCM for Food & Pharma

Your facility.
Delivered without
surprises.

Most projects don't fail because of bad engineering. They fail because nobody on the client's side is watching closely enough. We sit on your side of the table. As Owner's Project Managers and Owner's Engineers, we've managed €140M+ of food, pharma, and industrial projects making sure what gets designed, what gets procured, and what gets built is really what you need. No surprises. No excuses.

C2Improve facility engineering
⚙️ The C2 Method

See your facility
before it's built.

We use BIM and 3D modelling so you can walk through your project before a single component is ordered.

15+Years on the Client Side
€140M+Project Value Managed
0Critical Audit Findings
100%First-Time Audit Pass Rate

Whatever the engagement — full EPCM, Owner's Engineer, or standalone validation — we work from the client's side, with our expertise beside you.

Food & Beverage manufacturing
Pharmaceutical & biotech facilities
All project scales · all engagement types
The C2 Method

Built from the client's side of the table.

Every project in our portfolio was delivered as Owner's Project Manager or Owner's Engineer — representing your interests against contractors, suppliers, and programme pressures. We know what goes wrong because we've sat in the room when it happened.


How we work →
  • ⚙️
    Engineering

    Process plant, cGMP facility, and HACCP-integrated design. Drawn to be built, not to look good in a report.

  • 📋
    Project Management

    Weekly reporting that tells the truth. You know what's happening before you have to ask.

  • 🏗️
    Construction Management

    Your contracts, your authority. We represent you on site to make sure what was designed is what gets built.

  • 🔬
    Acceptance Testing & Handover

    FAT · SAT · IQ/OQ/PQ · UAT (CSV) — built into the engineering from day one, not reconstructed for the auditor.

Acceptance Testing & Handover

Validation isn't a phase you bolt on at the end. It's woven into every drawing.

If you've ever had an auditor flag your qualification documentation six months after the equipment was installed, you know the pain. We structure the entire engineering workstream around the V-model so your FAT generates IQ evidence directly. Your SAT feeds into OQ. For control systems and software (SCADA, DCS, MES), we extend this to User Acceptance Testing (UAT) under GAMP 5 Computer System Validation — so your digital and physical qualification runs in parallel, not in sequence.

V-Model IQ / OQ / PQ cGMP GAMP 5 UAT (CSV) FSSC 22000 / BRC
Acceptance Testing & Handover →
Recent Projects

Real projects. Real numbers. Names withheld.

We can't name our clients, that's their decision. But we can show you what we delivered, what it cost, and what happened when the auditor showed up.

Food

Dairy Processing Line: Cooperative, Gelderland

Full EPCM for a new UHT processing and aseptic packaging line inside an operating dairy factory — installed and commissioned without a single unplanned production stoppage, FSSC 22000 audit passed first time. €12.2M · €340K under budget · 18% energy reduction.

EPCMHACCPCIP/SIP2023
Pharma

Effluent & Solid Waste Treatment: Global Pharma Manufacturer, North Brabant

A major pharma manufacturer needed compliant waste treatment infrastructure across two containment streams (BSL2 and BSL3): liquid effluent and solid biological waste, both with strict decontamination requirements. €17M · 3 months ahead of schedule · first shredder-autoclave in a pharma plant.

Project MgmtEngineering2018–22
All case studies →
Who We Work With

Two industries where getting it wrong isn't an option.

We chose Food & Beverage and Pharmaceutical because these are the sectors where a shortcut in engineering creates a real-world safety problem. If your product goes into someone's body (as food or as medicine) the facility that makes it has to be right.

Start Small, Start Smart

Not sure you need full EPCM yet?

  • Validation Readiness Review — one-day pharma site review, gap analysis within 5 days
  • HACCP Engineering Audit — facility walkthrough, engineering vs. HACCP plan, prioritised list within 5 days
  • Project Definition Workshop — 2-day session, scoped brief with ±25% budget estimate within 10 days
Full details and booking →
What Clients Say

We let the work speak but sometimes clients do too.

"They delivered what our previous partner couldn't an inspection-ready facility before our commercial deadline. The qualification documentation was the cleanest I've ever seen."

VP Manufacturing

"We installed a complete new processing line without a single unplanned production stop. I didn't think that was possible in our facility. C2Improve made it possible."

Plant Director — Dairy Cooperative, Gelderland
🌱
Sustainability

Sustainability is an engineering decision — not a marketing statement.

Every process engineering decision has an energy consequence. We make design choices that reduce consumption, minimise waste, and help your facility meet CSRD reporting requirements — built in during design, not bolted on after.

How we approach sustainability →
📋
Free Download

Is EPCM Right for Your Project?

A 20-question checklist that helps you decide whether EPCM, EPC, or direct contracting is the right delivery model for your next capital project. Print it, fill it in, bring it to our first conversation.

Have a project that can't afford to go wrong? Let's talk.

Start a conversation Why EPCM? →
Work at C2Improve

We're always looking for engineers who think like us.

See open roles →
Readiness Assessment · 6 questions

How ready is your project?

Question 1 of 6

How well-defined is your project scope?

Idea stageWe know we need to do something, but not what
High-level conceptWe know what we want to achieve, not how
Detailed conceptOutline scope agreed, key decisions pending
Fully scopedScope locked, ready for engineering to begin

What is the status of your project budget?

No budget allocated yetStill in feasibility or business case stage
Rough internal estimateNumbers discussed but not formally approved
Budget approvedFormal CAPEX approval in place
Fully funded and releasedBudget available and project authorised to proceed

Have the regulatory requirements for your project been identified?

e.g. GMP, HACCP, environmental permits, containment classification

Not yet — we haven't looked at this
Partially identifiedWe know some requirements but the picture is incomplete
Fully mappedAll applicable frameworks identified and documented
In active compliance planningRequirements mapped and integrated into project planning

What is the status of your project site?

No site confirmedLocation still under consideration
Site identified but not securedPreferred location agreed, not yet contracted
Site securedOwned or leased, surveys and constraints known
Site ready for constructionPermits in progress or obtained, access confirmed

Are the key stakeholders aligned on project objectives?

Not yet — discussions still ongoing
Partially alignedBroad agreement but key decisions still open
Mostly alignedMain objectives agreed, some detail to resolve
Full alignmentObjectives, constraints, and success criteria agreed by all

When do you need the project completed?

No fixed dateTiming is flexible
More than 3 yearsLong planning horizon
1 – 3 yearsActive programme, moving toward delivery
Under 12 monthsUrgent timeline, pressure to move quickly
Your readiness report is ready. Enter your details to unlock your results. We'll also send a copy to your inbox. No sales calls unless you request one.